darrel
Junior Niva Petrol Head
Posts: 87
Registered: Apr 30, 2012 13:19:10 GMT 2
Karma: Exalt | Smite
|
Post by darrel on Dec 18, 2012 16:55:40 GMT 2
While I am trying to sort out my Layshaft CV joint and having a look at the Gearbox 3rd gear, preparations are underway for the replacement of the lot. 1) The Cross Member have been cleaned and repainted. 2) The Gearbox and Layshaft area have been properly scraped and decreased and then finally cleaned with Acetone. 3) Rust Converter have been applied to eliminate rust and to protect the metal. 4) The next step is to apply Stonechip once the Rust Converter has dried (6hrs) For those interested I will post pictures as I go along
|
|
Deleted
Posts: 0
Registered: May 4, 2024 11:13:34 GMT 2
Karma: Exalt | Smite
|
Post by Deleted on Dec 18, 2012 17:19:45 GMT 2
sounds like you have a good plan of action in place. I'm looking forward to the pictures
|
|